Well #2 is an outstanding success. Well #2 is the Beach community supply well located 18 kilometers from Playa Tesoro. Tesoro well #1 is located close by. In total, the 2 wells supply an enormous amount of of fresh, drinkable water for the Tesoro beach community. Well #2 was drilled in April 2023 to give excellent insurance for the future prosperity of the beach community with ample water to supply 300 homes and swimming pools.


Not to confuse the issue, but for clarity, well #3 is located on the Tesoro community club house site. This well is another huge success. This well supplies the 14 homes within eye sight with a huge resource of water for plants, trees, flowers and swimming pools. In June 2023, we created installation of pumps, a steel tower, large holding tank on the tower, irrigation pipelines and sprinklers. We now have hundreds of coconut trees growing along the beach front, set 3 rows deep. In a few growing seasons, we will have a coconut tree shaded beach front similar to the Atlantic coast and other tropical islands such as Hawaii.

